Weaving Mill Goes Captive
A 24/7 textile unit with punishing day loads. 2,900 modules across four sheds in a zero-export configuration, installed without stopping a single shift.
Representative of the 1000+ systems our founding partners have engineered across Gujarat, from GIDC rooftops to the Porbandar coast.
A 24/7 textile unit with punishing day loads. 2,900 modules across four sheds in a zero-export configuration, installed without stopping a single shift.
Clean-room ceilings meant no drilling on production days. The entire mounting system went up across six weekend shutdowns, commissioned two weeks early.
Ground-mount captive plant on 4.5 acres of company land, feeding two kiln units around the clock. Structures are single-axis-ready for a future tracker upgrade.
South-facing villa roof, hybrid inverter and lithium backup that rides through outages. The owner’s June electricity bill: ₹280, almost all of it fixed charges.
A corrosive-atmosphere site demanding marine-grade mounting. Our O&M crew has kept it above 99% uptime for three straight years.
Two 250 kW turbines beside a solar array: sun carries the day shift, coastal wind carries the night. The diesel gensets now start once a month, for testing.